Roadway and Infrastructure Engineering

Roadway projects must balance traffic operations, pavement performance, drainage, utilities, access, construction sequencing, and public impact. Waeltz & Prete provides practical roadway and infrastructure design for municipal, county, commercial, industrial, and development-related projects.

Roadway Services

Roadwork in progress near brick building

Roadway and street reconstruction.

Construction site with heavy machinery

Turn lanes and intersection improvements.

Building development under blue sky

Paving and grading design.

Aerial view of bridge construction site

Horizontal and vertical geometry.

Crew gathering near bridge construction site.

Curb-and-gutter and roadside drainage.

Construction site with large yellow pipes

Storm sewer, ditch, culvert, and crossing improvements.

Underground drainage system installation in progress

Utility relocation and conflict coordination.

Men smoothing concrete for driveway project

Driveway and access improvements.

Freshly poured concrete sidewalk construction

Pedestrian facilities and accessible routes.

Engineer in safety gear at site

Traffic-control plans and construction phasing.

Engineers examining construction plans outdoors

Quantities, cost estimates, specifications, bidding, and construction administration.

Pavement Preservation and Rehabilitation

For smaller roadway assignments, the appropriate treatment may include localized repair, full-depth reconstruction, milling, asphalt overlay, or seal coat. We coordinate treatment limits, transitions, drainage effects, shoulders, pavement markings, traffic control, quantities, specifications, and construction considerations with the owner’s maintenance objectives and available pavement information.

Roadwork with exposed sewer grate

Constructability Matters

A roadway plan must account for how traffic, residents, businesses, utilities, emergency access, and drainage will function during construction. We consider sequencing and temporary conditions during design, so the final documents are more useful to the owner and contractor.