Engineering Projects That Shape Central Texas
Our work includes public infrastructure, roadway improvements, drainage systems, commercial and industrial development, subdivisions, water and wastewater utilities, floodplain projects, and construction administration. The following examples demonstrate the range of engineering, permitting, and coordination services provided by Waeltz & Prete.
Roadway & Infrastructure Improvement Projects
E. Bagdad Road Reconstruction
Location: Round Rock, Texas
Reconstruction of a local roadway serving the Depot Townhomes area. The work included roadway design, drainage and storm sewer, grading, water and wastewater infrastructure, dry-utility coordination, platting and development coordination, permitting, and construction documents.
Key services: Roadway reconstruction; drainage; storm sewer; utilities; permitting; construction plans.
Red Bud Lane Improvements
Location: Round Rock, Texas
Addition of a right-turn lane and median improvements. Roadside drainage was reconfigured, and box culverts were incorporated to accommodate the roadway improvements.
Key services: Turn lane; median; grading; roadside drainage; box culverts.
North Mays Street Right-Turn Lane
Location: Round Rock, Texas
Design of a right-turn lane serving a charter school. The scope included paving, grading, dry-utility relocation, storm sewer modifications, stormwater quality, and TCEQ-related permitting.
Key services: Roadway widening; paving; grading; drainage; utilities; water quality; permitting.
Seton Parkway/Arterial T
Location: Round Rock, Texas
Roadway and utility infrastructure associated with the early phases of Seton Parkway in the Avery Centre area. The project included grading, drainage, box culverts, a 16-inch waterline extension, restraints, air-release provisions, valving, bidding, and construction administration.
Key services: Roadway; drainage; box culverts; 16-inch waterline; bidding; construction administration.
Downtown Street Reconstruction
Location: Round Rock, Texas
Reconstruction of Pecan Avenue, Circle Drive, Parkway Street, and Nelson Avenue. Improvements included curb and gutter, storm sewer, wastewater replacement, waterline relocation, and neighborhood streetscape improvements.
Key services: Street reconstruction; curb and gutter; storm sewer; water; wastewater.
Brushy Creek Trail Improvements
Location: Round Rock, Texas
Approximately 1.5 miles of bicycle and pedestrian facilities along Brushy Creek. The design included utility relocations, floodplain analysis, a box-culvert tunnel, and a gabion low-water crossing.
Key services: Trail; floodplain analysis; box culvert; low-water crossing; utility relocations.